The Hornsea Two OFTO is situated in the southern North Sea about 90km off the East Yorkshire coast.

The OFTO is a 1300MW connection between the generators and onshore transmission system

The three offshore substations are connected to a reactive compensation station by three undersea cables which are up to 84km long. The reactive compensation station is connected to shore by 3 undersea cables which are 66km which come ashore at Horseshoe Point, south of Grimsby. The onshore cables, which are about 39km long, connect to the onshore substation at Killingholme.

Downloadable Documents

  • DTPHT Separation and Independence of the Transmission Business Compliance Statement Issue 1

    Size: 834 KB Download
  • DTPHT Decommissioning Programme

    Size: 1 MB Download
  • DTPHT Transmission Licence

    Size: 979 KB Download
  • DTPHT Regulatory Accounts 2023-24

    Size: 523 KB Download
  • DTPHT Basis of Transmision Owner Charges 2024-25 - Issue 4

    Size: 291 KB Download
Diamond Transmission hero image