The Burbo Bank OFTO is situated in the Bay of Liverpool about 20km off the coast of Liverpool and is approximately 8km east of Gwynt y Môr and 8km north east of North Hoyle wind farms.
The OFTO is a 258MW connection between the generators and onshore transmission system.
The offshore substation is connected to the shore by a 24.3km undersea cable, which comes ashore near Bodelwyddan. The onshore cables, which are about 10.4km long, connect to the onshore substation at Bodelwyddan.